Vendor Name: CCA CIVIL
Agency Name: Transportation, Department of
Department/Facility Name: Department of Transportation
Contract Number: D261790
Current Contract Amount: $119,887,531.71
Spending to Date: $119,887,531.71
Contract Type: Construction - Highway
Contract Information
Contract Amendment Information
Transaction Type | Transaction Amount | Contract Start Date | Contract End Date | Description | Transaction Approved/Filed Date | |
---|---|---|---|---|---|---|
Original Contract data not available for this contract record. |
Transaction Type | Transaction Amount | Amended End Date | Description | Transaction Approved/Filed Date |
---|---|---|---|---|
Amendment | $250,000.00 |
CO#1 - Staten Island Expressway Reconstruction, Richmond County | 05/21/2012 | |
Amendment | ($1.00) |
CO#2 Loadspring Primavera Contract Managemt Hosting application software | 10/10/2012 | |
Amendment | ($1.00) |
CO# 3 | 11/20/2012 | |
Amendment | ($1.00) |
CO# 4 Credit | 12/21/2012 | |
Amendment | $506,400.00 |
CO# 5; Field Chg Payment decrease & increase for Fill Type Retaining Walls | 03/01/2013 | |
Amendment | ($10.00) |
CO# 6 Credit | 03/14/2013 | |
Amendment | $45,590.80 |
CO#8 | 05/16/2013 | |
Amendment | ($4.29) |
CO# 9 Credit | 06/11/2013 | |
Amendment | ($6.68) |
CO# 10 Add item for epoxy coated rebar for noise walls- decrease field chg pymt | 07/12/2013 | |
Amendment | $993,997.55 |
CO# 12 New storm drain moved due to rock containing naturally occurring asbestos | 08/19/2013 | |
Amendment | ($117,728.43) |
CO#11 value engerineering | 08/30/2013 | |
Amendment | ($10.00) |
CO# 13 Field Change Pymt - Increase & Decrease CREDIT | 09/16/2013 | |
Amendment | ($5.00) |
CO# 20 Increase for removal of substructures, etc & decreases;Staten Island Xway Reconstr Richmond | 12/06/2013 | |
Amendment | $1,326,000.00 |
CO# 18 Resubmittal - New item for rock drilling for noise barrier Caisso Staten Isl Xway Reconstruct | 02/24/2014 | |
Amendment | $1,316,157.00 |
CO#16 Add'l excavation & revised drainage Staten Island Expressway Reconstruct Richmond Co | 03/18/2014 | |
Amendment | $594,432.00 |
CO #22- add 950.2501 utilities- Staten Island Expressway Reconstruction- Richmond Co | 03/26/2014 | |
Amendment | $1,345,856.68 |
CO# 24 Major design chgs permeable base removal,increase concrete items/reloc xovers/truing&leveling | 06/13/2014 | |
Amendment | ($10.00) |
CO# 17 Premium Portion of the Labor for Stage 1 Acceleration | 06/25/2014 | |
Amendment | ($10.42) |
CO#26 Loadspring Contract Mgmt Staten Island Expressway Reconstruct Richmond Co | 09/08/2014 | |
Amendment | ($640,851.55) |
CO# 25 VECP Savings Alt Barrier Design cost/savings Staten Island Xway Reconstruct Richmond Co | 09/18/2014 | |
Amendment | $1,191,879.55 |
CO# 27 Overruns/underruns due to poor condition of permeable base | 12/30/2014 | |
Amendment | $275,000.00 |
CO# 28 Premium Portion of labor for Stage II Acceleration Staten Island Expresswy Reconstr Richmond | 01/15/2015 | |
Amendment | $1,492,000.00 |
CO# 29 Overrun Tru&Lvl, resset exist drain frms & rock drilling for noise barrier caisso | 02/09/2015 | |
Amendment | $0.00 |
10/14/2015 | CO# 031, NCTE, Staten Island Expressway Reconstruction, Richmond County | 03/02/2015 |
Amendment | $182,000.00 |
CO# 32 Accelerate EB SIE shoulder widening, curb & base concrete work btwn Victory Blvd & Manor Rd | 05/11/2015 | |
Amendment | ($3.29) |
CO#33 - Increases/Decreases to existing items, SIE Bus Lane Extension | 05/19/2015 | |
Amendment | $50,000.00 |
CO# 34 Acceleration#4 Schedule Recovery&Decrease Winter Pavemt Patching SIE Bus Lane X'sion Richmond | 06/01/2015 | |
Amendment | ($40,136.79) |
CO# 35 Value Engineering for Precast Retaining Wall Staten Island X'way Region 11 | 06/17/2015 | |
Amendment | ($6.94) |
Co# 36 New item for topsoil & decrease Field Chg Payment item Staten Island Expressway Bus Line Ext | 06/23/2015 | |
Amendment | $210,000.00 |
CO#37 Acceleraton # 5 Schedule Recovery Staten Island Expressway Bus Line Ext Richmond | 07/17/2015 | |
Amendment | ($3.00) |
CO# 38 2 new items &Decreases to various other items SIE Bus Lane Xtion btwn Victory/Clove Rd Reg 11 | 09/01/2015 | |
Amendment | ($6.59) |
CO# 39 Trussed Arm Cantilever WB, Staten Island Xway Reconst & Bus/HOV Lane Richmond Co. | 09/14/2015 | |
Amendment | ($3.54) |
10/14/2015 | CO 42 SIE Bus lane extension Region 11 | 11/20/2015 |
Amendment | ($6.67) |
10/14/2015 | CO#43 Staten Island Expressway Bus Line Ext Richmond | 12/08/2015 |
Amendment | $0.00 |
03/28/2016 | CO#41 NCTE Staten Island Expressway Bus Line Ext Richmond | 12/22/2015 |
Amendment | ($2.95) |
03/28/2016 | CO 44 Mulch, wildflower Pond 2 and 3 Region 11 SIE bus lane ext | 02/26/2016 |
Amendment | ($1.23) |
03/28/2016 | CO 45 SIE reconstruction Region 11 | 04/18/2016 |
Amendment | ($0.01) |
06/30/2016 | CO# 049, NCTE, SIE BUS LANE EXTENSION BETWEEN VICTORY BLVD. AND CLOVE ROAD. | 04/26/2016 |
Amendment | $111,992.58 |
06/30/2016 | CO# 046, NEW ITEM, SIE BUS LANE EXTENSION BETWEEN VICTORY BLVD. AND CLOVE ROAD. | 05/11/2016 |
Amendment | $19,746.02 |
06/30/2016 | CO 48 Signs, fences,fuel,asphalt SIE bus lane extension Region 11 | 05/20/2016 |
Amendment | $19,962.10 |
06/30/2016 | CO 55 New items Rock discovered ,HMA sidewalks, driveways, bicycle, vegetation control strips | 05/27/2016 |
Amendment | $19,614.58 |
06/30/2016 | CO 50 increase and decreases in items SIE bus lane extension Region 11 | 06/22/2016 |
Amendment | $285,000.00 |
06/30/2016 | CO 52 SIE Bus lane Emergency pot hole repair Region 11 | 07/08/2016 |
Amendment | $6.20 |
06/30/2016 | OOC 042; +$6.19; Overruns/Under of items SIE Lane Extension Region 11 | 08/02/2016 |
Amendment | $151,992.01 |
06/30/2016 | CO 43 New items lightening and relocating signs size D, and overruns SIE bus lane Region 11 | 08/24/2016 |
Amendment | $600,000.00 |
06/30/2016 | CO 55 West bound Slosson exit ramp widening work SIE Region 11 | 10/21/2016 |
Amendment | ($1.00) |
CO# 58 SIE bus lane ext victory Blvd and Clove Rd Settling up contract | 01/18/2018 | |
Amendment | $29,943.59 |
CO#57 Cleanup & Claim Settlement | 05/10/2018 |